Aphex World Cup 2018 Prize Draw!

June 08, 2018

We're incredibly excited about the World Cup and have sent out a bunch of Aphex World Cup Wall Charts all over the UK!

Although it's been a while since England have taken home the World Cup, we're hosting a prize draw and giving you the chance to take home a World Cup jersey of your choice!

  • Aphex World Cup Prize Draw Terms & Conditions

  • To enter the prize draw, applicants must:

  • Be atleast 18 years old

  • Follow @Aphex Tweets

  • Tweet @AphexTweets with #AphexGoals and a picture of your wall chart!

  • Only one entry per person. Entries on behalf of another person will not be accepted and joint submissions are not allowed.

  • All entries must be made by midnight on the 14th of July, 2018 (GMT).

  • One winner will be selected by a random computer process on the 15th of July 2018. The winner will be announced on Twitter on the 15th of July, 2018 - the day of the World Cup final.

  • The winner will be notified by direct message on Twitter on the 15th of July 2018 and must provide an email and postal address to claim their prize. If a winner does not respond within 14 days of being notified by Aphex, then the winner’s prize will be forfeited and Aphex will be entitled to select another winner in accordance with the process described above (that winner will have to respond to notification of their win within 14 days or else they will also forfeit the prize).

  • The prize draw winner will receive a FIFA World Cup 2018 jersey from the Nation of their choice. Prizes will be subject to online availability.

  • The prize is non-exchangeable, non-transferable and is not redeemable for cash or any other prize.

  • Aphex reserves the right at any time and from time to time to modify or discontinue, temporarily or permanently this Prize Draw with or without prior notice due to reasons outside its control (including, without limitation, in the case of anticipated,suspected or actual fraud). The decision of Aphex under all matters under its control is final and binding and no correspondence will be entered into.

  • The Prize Draw will be governed by English law and entrants to the Prize Draw submit to the exclusive jurisdiction of the English courts.

The prize draw is being conducted by:
Aphex Consulting Limited.
1-3 Rivington street, London EC2A 3DT

If you'd like an Aphex World Cup Wall Chart, and a chance to win a World Cup jersey of your choice then follow us on Twitter and tweet @AphexTweets asking us for one!

Hear more from us

Sign up to our email newsletter to find out what’s happening in our world.

Sign up