Pizza Plan!

February 05, 2019

To enter the prize draw, applicants must:

  • Be atleast 18 years old

  • Be based in the United Kingdom

  • Register for an Aphex Planner Free Trial on www.aphex.co.

  • Only one entry per person. Entries on behalf of another person will not be accepted and joint submissions are not allowed.

  • All entries must be made by midnight on the 28th of February, 2019 (GMT).

One winner will be selected by a random computer process on the 1st of March 2019. The winner will be announced on Twitter @AphexTweets at 12pm on the 1st of March 2019.

The winner will be contacted by email on the 1st of March 2019 and must provide a site address to claim their prize. If a winner does not respond within 14 days of being notified by Aphex, then the winner’s prize will be forfeited and Aphex will be entitled to select another winner in accordance with the process described above (that winner will have to respond to notification of their win within 14 days or else they will also forfeit the prize).

The prize draw winner will receive pizza for their team! Prizes will be subject to location availability.

The prize is non-exchangeable, non-transferable and is not redeemable for cash or any other prize.

Aphex reserves the right at any time and from time to time to modify or discontinue, temporarily or permanently this Prize Draw with or without prior notice due to reasons outside its control (including, without limitation, in the case of anticipated,suspected or actual fraud). The decision of Aphex under all matters under its control is final and binding and no correspondence will be entered into.

The Prize Draw will be governed by English law and entrants to the Prize Draw submit to the exclusive jurisdiction of the English courts.

The prize draw is being conducted by: Aphex Consulting Limited. FORA 71 Central Street, London EC1V 8AB contact@aphex.co

Hear more from us

Sign up to our email newsletter to find out what’s happening in our world.

Sign up